Laserfiche WebLink
• Revised, February 2001 <br />SENECA COAL COMPANY <br />2000 RN01-YOAST MINE <br />BOND EQUIPMENT AND LABOR COST ASSUMPTIONS <br />SUMMARY SHEET <br />Single Shift <br />Basis <br />14H MOTORGRADER COST SUMMARY <br />CDMG COST PER HOUR $108.77 <br />637E SCRAPER COST SUMMARY <br />CDMG COST PER HOUR $273.27 <br />992C LOADER COST SUMMARY <br />CDMG COST PER HOUR $201.23 <br />D11 N DOZER W/O RIPPER COST SUMMARY <br />CDMG COST PER HOUR $315.39 <br />• D3C DOZER COST SUMMARY <br />CDMG COST PER HOUR <br />$55 <br />28 <br /> . <br />D60K OVERBURDEN DRILL COST SUMMARY <br />CDMG COST PER HOUR $488.15 <br />5000 GALLON WATER TRUCK COST SUMMARY <br />CDMG COST PER HOUR $90.01 <br />LIGHT PLANT COST SUMMARY <br />CDMG COST PER HOUR $9.06 <br />(Excludes Operator) <br />GENERAL LABORER <br />CDMG COST PER HOUR $17.67 <br />D11N DOZER W! RIPPER COST SUMMARY $330.47 <br />CDMG COST PER HOUR <br />Note: Rates are all inclusive-rent, labor, benefits, etc. and were supplied by DMG <br />• <br />25-1-38 Revised 02/01 <br />