Laserfiche WebLink
• SENECA COAL COMPANY <br />2000 RN01-YOAST MINE <br />HAUL SURFACE MATERIAL (Facilities) <br />FACILITIES RECLAMATION ACTIVITIES <br />VOLUME TO BE MOVED <br />SCRAPER FLEET COST <br />EQUIPMENT UNITS <br />SCRAPER 4 <br />14-H 1 <br />WATER TRK 1 <br />TOTAL COST <br />3 See FPC Worksheets <br /> <br /> <br />D(ft) <br />1 8,067 LCY <br />11,285 tons <br />Area(ac) <br />5 <br />TOTAL EQUIP. <br />& LABOR UNIT <br />COST <br />$273.27 <br />$75.66 <br />$58.52 <br />Cost/Hour Total <br />$1,227.26 $57,681 <br />Hours (3) <br />47 <br />TOTAL <br />COST <br />$1,093.08 /SCH HR <br />$75.66 /SCH HR <br />$58.52 /SCH HR <br />25-I-22 Revised 02/01 <br />