Laserfiche WebLink
~- PURGE VOLUME Was the 3-displacement purge goal being achieved? <br />AmerAlia is now verifying the 3-well bore displacement purge volume <br />goal for the Uinta and A-Groove monitoring wells. The next sampling of <br />the B-Groove well will verify the 3-well bore displacement purging for the <br />B-groove well. As always, the BLM is invited and encouraged to attend <br />and participate in our water sampling activities. <br />3- DISCHARGE RESTRICTION Purge water disposal plan revision <br />This is the main concern of this letter. The purge water from the <br />Dissolution Surface Aquifer monitoring well is of such poor quality, the <br />_„_ BLM required_AmerAlia to_stop releasingatto the on-site,pit. _ _. . <br />The 3-well bore displacement purge volume sampling method was <br />extensively discussed with the BLM during the monitoring plan <br />development and approval activity. Monthly sampling commenced in <br />January 2000. Until the May 2000 sampling, MWD-l and MWD-2 purge <br />water was directed to the drilling pit. <br />The EPA staff was helpful by providing a April 19961ow purge volume <br />sampling protocol paper by Puls and Barcelona. The authors explain this <br />sampling method is viable for specific well construction and site <br />hydrology. Specific concern is expressed related to the conditions present <br />in the sampling interval of MWD-1 and MWD-2. <br />Criven the results of the exploration and monitoring activity, AmerAlia <br />finds no cause to continue sampling the Dissolution Aquifer. The <br />Dissolution Surface Aquifer is not a resource and sampling is not <br />necessary to protect the drinking water resources. This is true regionally <br />and is consistent with current and historical BLM, EPA and DMG <br />resource management actions. As explained in greater detail in our July <br />. __ _ _ 10,.2000.1etter,_AmerAlia feels it is unwise and unnecessary to continue <br />sampling, with or without discharging water from the sampling activities. <br />AmerAlia also believes it is unreasonable for the BLM to expect AmerAlia to continue <br />sampling the Dissolution Surface Aquifer for consistency with other Piceance Basin <br />projects. AmerAlia's project is not the same as other operations in the Piceance Basin. <br />AmerAlia's mine plan does not propose nor does it allow commingling mining solutions <br />with the Dissolution Surface Aquifer. AmerAlia's mine plan does not inject disposal <br />fluids into the Dissolution Surface Aquifer. The result of the ground water exploration <br />program did not yield troubling results requiring explanation as the potential adverse <br />impacts of pilot solution mining or shaft sinking activity by others. The quality of our <br />monitoring program and analytical results of our ground water exploration provide a <br />sound foundation upon which the agencies can act with confidence, <br />