Laserfiche WebLink
rn®fea ~ as ~ • <br />ROY R. CELLAN <br />Corpoare Manager <br />aeclamahon <br />July 1 s, 2001 <br /> <br />.wl± z ~ zeo~ <br />State of Colorado <br />Division of Minerals and Geology <br />Durango Field Office <br />701 Camino Del Rio, Room 125 <br />Durango, CO 81301 <br />BIY/5101! of NAiReinr: ~,,,,, <br />Attn: Mr. Steve S. Shuey, Reclamation Specialist <br />RE: Bulldog Mine Reclamation Project <br />June, 2001 Monthly Monitoring Report <br />Dear Mr. Shuey: <br />~J <br />ENVIRONMENTAL, HEALTH, SAFETV <br />AND GOVERNMENT AFFAIRS <br />®ENV~13 ©~FIC~ <br />PU13LiC BILE ~®P~ <br />FiLE:_ Wt-19~}-Z~ 5- <br />rr'~ITE: ~.v6~c~ff.'E,,,,, ~~~ <br />~~Gr'OLO~IG 1~'60w1~/t <br />R~elv~al <br />J~1 2 4 <br />owie°u~n9~, <br />'~~ o~iylna ~ G~//,~,~.," <br />'+ry <br />Pursuant to the Technical Revisions to the Reclamation Permit for the Bulldog Reclamation <br />Project, this is the forty third monthly report pertaining to 11 installation and operation of an <br />infiltration trench to accommodate seepage from the 9360 adit, and 21 closing the valve at the <br />9360 adit plug. The Division of Minerals and Geology (DMGI, in a letter dated March 8, 1999, <br />issued a conditional approval for Homestake Mining Company (HMC) to close the valve at the <br />9360 adit plug. Subsequent to DMG's approval, HMC closed the valve to the adit plug on April <br />1, 1999. Since closure of the adit plug valve, no flow has been directed into the infiltration <br />trench. Monitoring of the hydraulic conditions behind the adit plug indicated that as of August <br />25, 1999, conditions had stabilized lie pressure measurements stabilizedl. As a result, DMG <br />approved initiation of the planned tracer test (Ref: Letter from WMCI to Mr. Steve Shuey, dated <br />August 27, 19991• The tracer test subsequently began on September 9, 1999. With the <br />initiation of the tracer test, HMC is committed to the monitoring summarized in Table 1 in <br />accordance with the approved Technical Revisions. <br />The revised monitoring program was initiated in September 1999. A summary of the monthly <br />monitoring data is presented in Table 2. Based on the required visual inspection around the adit <br />plug, the plug is impounding water behind it with no signs of seepage and/or development of <br />seeps around the portal area. A pressure measurement and visual observation was completed of <br />the 9360 adit plug and portal on June 14, 2001 and recorded in Tablo 3. In accordance with the <br />approved monitoring schedule (Table 11, water samples for tracer analysis (WGLW and 9700W1 <br />were taken on June 14, 2001. Analytical data for these samples are attached. <br />As part of this monthly report and in accordance with the 9360 Level Adit Closure Monitoring <br />Plan, dated April 1998, Windy Gulch monitoring was continued during this period. Water levels in <br />the Creede Formation Well, located upslope of the 9360 Adit, have been recorded continuously <br />since its installation, and data for the last year are presented graphically in Figure 1. Flow data for <br />the WGL Weir has been recorded continuously with an automated datalogger since April 17, <br />2001. Flow data for the WGL Weir are presented in Figure 2. A water quality sample (WGL Weir) <br />was taken on June 14, 2001. The analytical results for this sample are attached. <br />HOMESTAKE MINING COMPANY <br />PO BO%9B ~ GRANTS. NM B]020 OOt 1 <br />