Laserfiche WebLink
HOM AKE <br />ROY R. CEL==LAN ~ U(~~rh7~~CI6 Fm.~ ENVIRONMENTAL, HEALTH, SAFETY <br />CORPORATE MANAGER `~•. ~':' 'off ANO GOVERNMENT AFFAIRS <br />RECLAMATION <br />AUG 2 ? 1001 <br />August 15, 2001 Dirisron - PAC A`''~lCp <br />ollV7in¢rakandpealagp YJCItl V 6:.Y~ QI-1-1C~ <br />PUELIC PILE C®~~ <br />~F+ILE: fit.- lq ~~ - Zi s Received <br />State of Colorado SITL: piydlGW 9 IIq,I M.A./ <br />Division of Minerals and Geology r' I ~,I ~ LL y <br />Durango Field Office 1~c~`'wy ny'Q~"ay rtncy>; AUG ~ n <br />701 Camino Del Rio, Room 125 ( ( I <br />Durango, CO 81301 ~~~ ~Bf <br />Attn: Mr. Steve S. Shuey, Reclamation Specialist ~hdBWrrofMmara7~8Geo1p8Y <br />RE: Bulldog Mine Reclamation Project July, 2001 Monthly Monitoring Report <br />Dear Mr. Shuey: <br />Pursuant to the Technical Revisions to the Reclamation Permit for the Bulldog Reclamation <br />Project, this is the forty-fourth monthly report pertaining to 1) installation and operation of an <br />infiltration trench to accommodate seepage from the 9360 adit, and 2) closing the valve at the <br />9360 adit plug. The Division of Minerals and Geology (DMG1, in a letter dated March 8, 1999, <br />issued a conditional approval for Homestake Mining Company (HMC) to close the valve at the <br />9360 adi[ plug. Subsequent to DMG's approval, HMC closed the valve to the adit plug on <br />April 1, 1999. Since closure of the adit plug valve, no flow has been directed into the <br />infiltration trench. Monitoring of the hydraulic conditions behind the adit plug indicated that as <br />of August 25, 1999, conditions had stabilized lie pressure measurements stabilizedl• As a <br />result, DP,AG approved initiation of the planned tracer test (Ref: Letter from WMCI to Mr. Steve <br />Shuey, dated August 27, 19991• The tracer test subsequently began on September 9, 1999. <br />With the initiation of the tracer test, HMC is committed to the monitoring summarized in Table <br />1 in accordance with the approved Technical Revisions. <br />The revised monitoring program was initiated in September 1999. A summary of the monthly <br />monitoring data is presented in Table 2. Based on the required visual inspection around the <br />adit plug, the plug is impounding water behind It with no signs of seepage and/or development <br />of seeps around the portal area. A pressure measurement and visual observation was <br />completed of the 9360 adit plug and portal on July 13, 2001 and recorded in Table 3. <br />As part of this monthly report and in accordance with the 9360 Level Adit Closure Monitoring <br />Plan, dated April 1998, Windy Gulch monitoring was continued during this period. Water levels <br />in the Creede Formation Well, located upslope of the 9360 Adit, have been recorded <br />continuously since its installation, and data for the last year are presented graphically in Figure <br />1. Flow data for the WGL Weir has been recorded continuously with an automated datalogger <br />since April 17, 2001. Flow data for the WGL Weir are presented in Figure 2, however the <br />stream was dry eliminating any possibility of obtaining a water sample or flow data in .July. <br />HOMESTAKE MINING COMPANY <br />P.O. BO%9B • GRANTS. NM B]020-00~~ <br />