My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64096
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:06 PM
Creation date
11/20/2007 8:16:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
Tab 13 Postmining Land Use
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Site clearing is performed immediately prior to soil removal in a given area. Clearing <br />includes removal of woody or other materials which could interfere with soil removal, or <br />potentially contaminate soil. Site clearing and soil salvage operations are typically <br />conducted from May to November. These activities may be conducted in other months if <br />weather conditions permit. <br />gac kfilling and grading activities are performed throughout the year. <br />Soil redistribution and associated graded spoil suitability determinations follow the same <br />timetable as salvage operations. If ground conditions permit, soil redistribution may be <br />conducted in months other than the primary months indicated in the reclamation timetable <br />(Figure 13-1). Tillage and seedbed preparation (when necessary), cover cropping, end <br />seeding of resoiled areas is conducted in the next favorable planting season after soil <br />redistribution, weather permitting. Therefore, the schedule for these activities may <br />parallel the soil redistribution schedule in many cases. Tree and shrub planting is <br />performed in [he fell es dormant plantings, but may be planted in spring on occasion. <br />Tree and shrub planting areas are prepared during spring, summer, and fell. <br />Fence construction is generally performed from April to November. Construction is <br />interrupted only 6y inclement weather or snowpack. <br />Maintenance and management activities ere conducted throughout the year, weather and <br />snowpack conditions permitting. The timing of these activities is dependent upon the <br />specific activity. Fence maintenance and removal of any trespass livestock ere generally <br />conducted from mid-spring through fall. Interseeding and any necessary reseeding is <br />conducted in the next favorable planting season following the decision to interseed or <br />reseed. Erosion monitoring is conducted after snowmelt and heavy rains, with any required <br />repairs carried out from late spring through fall. Occasionally, [he operations outlined <br />above will be completed during winter months when mild weather persists. Under normal <br />conditions, the schedules are as presented. <br />Protected Reclamation Schedules. The projected backfilling and grading schedule for the <br />remaining Seneca It life-of-mine is presented on Exhibit 13.2. <br />. The annual projection of areas graded as presented on Exhibit 13-2 are based upon certain <br />basic considerations. First, the backfilling and grading schedule is based upon the <br />operation plan, coal excavation cycle times, and pit configuration. Cycle times are <br />13-63 Revised 12/01/93 <br />