My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27646
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:04 PM
Creation date
11/20/2007 8:16:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Hydrology
Doc Date
2/26/1993
Doc Name
NOV & CEASE & DESIST ORDER & CLEAN UP ORDER
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f~ ~ <br />4. On July 23, 1992, a representative of Trinidad Basin met with representatives of the <br />Division to discuss the dischazge of June 29, 1992. As a result of the meeting, Triridad Basin <br />agreed to apply fora CDPS permit to regulate discharges from the sediment ponds. During the <br />meeting, the representative from Trinidad Basin was informed that a permit could not be issued until <br />the outstanding balance for past permit fees was paid. <br />5. The Division received a permit application on July 23, 1992. To date, the outstanding <br />balance for permit fees has not been paid and a discharge permit has not been drafted. <br />6. On July 29, 1992, representatives of the DMG inspected the mine. A discharge was <br />observed from pond 15-P2 into the Del Aqua Arroyo. A sample of the discharge was collected and <br />analyzed. The results of the analysis showed the following level of pollutants: <br />Pollutant Concentration <br />Total Suspended Solids, mg/l 780 <br />Settleable Solids, ml/I >40 <br />Iron, mg/I 77 <br />pH, s. u. 7.2 <br />7. On July 29, 1992, representatives of the DMG inspected the mine. A discharge was <br />observed from pond 15-P11 into the Del Aqua Arroyo. A sample of the discharge was collected <br />and analyzed. The results of the analysis showed the following level of pollutants: <br />Pollutant Concentration <br />Total Suspended Solids, mg/I 2210 <br />Settleable Solids, ml/1 >40 <br />Iron, mg/l 48 <br />pH, s. u. 6.7 <br />8. On August 19, 1992, representatives of the DMG insetted the mine. A discharge was <br />observed from pond 15-P10 into the Del Aqua Arroyo. A sample of the discharge was collected <br />and analyzed. The results of the analysis showed the following level of pollutants: <br />Pollutant Concentration <br />Total Suspended Solids, mg/1 110 <br />9. Discharges from the ponds contain pollutants as defined by 25-8-103(15), C.R.S. (1989 <br />Repl. Vol. 11A and 1992 Supp.). <br />10. The Del Agua Arroyo is "state waters" as defined by 25-8-103(19), C.R.S. (1989 Repl. <br />Vol. I IA and 1992 Supp.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.