Laserfiche WebLink
Table L-1 RECLAMATION COSTS <br /> <br />Activity Volume/Area/ <br />Application Rate <br />Unit Cost Total <br />Cost <br />Decommissioning of Structures All Structures ----- S 25,250 <br />Evaporation Pond Maste Disposal <br />Salt Removal 1,373 tons E 10.00/ton 13,730 <br />Liner Removal 3 ponds S 500.00/liner 1,500 <br />Grading 10,832 yd3 S 1.00/yd3 10,832 <br /> <br />Topsoiling ~ <br />18,553 yd- a <br />S 1.00/yd" <br />18,553 <br />Seeding <br />Surface Preparation 13.9 acres S 50.00/acre 695 <br />Seed Mix 12.9 lb/acre (13.9 acres) S 4.00/lb 111 <br />Seed Placement 13.9 acres f 50.00/acre 695 <br />Fertilization <br />Fertilizer 250 lb/acre (13.9 acres) f 0.12/lb 417 <br />Application 13.9 acres S 50.00/acre 695 <br />Mulching <br />Straw Mulch 3000 lb/acre (13.9 acres) S 100.00/ton 2,085 <br />Placement 13.9 acres S 50.00/acre 695 <br /> <br />Total S 15,864 <br />Unit Cost Per Acre: S 5,458 <br />