Laserfiche WebLink
<br />• <br /> <br />New Horizon 2 <br />Reclaimed Krill Drainage Channel Design <br />Introduction <br />The design of the reclaimed drainage channel in the New Horizon 2 permit area was based on <br />DMG regulations for conveyance of overland flow of watersheds less than one square mile. The <br />reclaimed channel is shown on Map 2.05.4-2 between points AA to AA'. The premine drainage <br />channel slope is 3.0 percent and the postmining drainage channel will be 3.18 percent. <br />Design <br />For the design of this reclaimed channel, the SEDCAD + model was used to predict runoff from <br />the watershed (see Attachment A). A 10-year, 24-hour precipitation event was used in the design. <br />The peak flow was determined at the downstream end of the drainage channel. Following is a list <br />of main input factors. <br />Input Channel AA-AA' <br />Precipitation 2.0 in <br />Drainage Area 159.75 ac <br />CN 81 <br />L 4000 ft <br />Y 165 ft <br />Outaut <br />Q 31.38 cfs <br />Based on this discharge, SEDCAD+ was used to design the reclaimed drainage channel bottom <br />width based on Manning's equation calculation. The shape of the channel was assumed to be <br />trapezoidal with 10h:iv side slopes. The channel bottom width was increased to insure that the <br />(Revised July 2006) <br />Attachment 2.05.4(2)(c)-1-2 <br />