Laserfiche WebLink
• A summary of the CEC acreages disturbed, those already reclaimed, and those remaining <br />to be reclaimed is presented below: <br />Disturbed areas with Acreages: <br />A- and B-Pits/local areas 67.6 acres <br />Long-term spoil area 50.8 acres <br />Topsand piles A-1, A-3, B-1 and B-2t 23.1 acres <br />Roads and Sediment Pond 2 72.0 acres <br />Facilities area 10.0 acres <br />Total area remaining to be reclaimed 212.5 acres <br />Total area reclaimed and revegetated 226.5 acres <br />Grand Total 439.0 acres* <br />*The grand total (413 acres) is at variance with the previous acreage calculations <br />due primarily to survey inconsistencies which CEC believes were resolved with <br />the most recent mapping activity (1995 and 1996). <br />• Also, the following information provides a summary soil balance of both the overburden <br />soils and tpsand volumes: <br />OVERBURDEN SO1LS <br />Quantities Re~guired <br />A- and B-Pits (6 feet cover) 281,000 BCY <br />Sediment Pond 2 +26.000 BCY <br />Total 307,000 BCY <br />Stockpiled Quantity <br />Long-term spoil area 353,000 BCY <br />- 307.000 BCY -from above <br />Total Remaining** 46,000 BCY, surplus <br />**Total soil materials remaining to be graded (sloped) and revegetated. <br /> <br />~ Topsand pile B-2 has been incorporated within pile A-3 Cor ee(erence and mapping purposes. <br />114a 10/00 <br />