Laserfiche WebLink
<br />RECLAIUTION COST SUWARY cont'd sheet 3 of 4 <br />H. EARTXNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />n/a <br />Subtotal (H): <br />____________ <br />1. EARTHYORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Tesk No.~ Tesk Description ~ Cost (f) <br />________I____________________~___-____________-______--____I___-______-_ <br />7 ~ Trench/lay pipe for ditch diversion ~ 523,501 <br />Subtotal (I): f23,501 <br />J. EARTXNOItK - TOPSOIL/SUBSOIL REPLACEMENT <br />Tesk No.~ Tesk Description <br />2 ~ Spread topsoil <br />Cost (S) <br />f93,334 <br />Subtotal (J): f93,334 <br />