Laserfiche WebLink
w <br /> Page 3/3 <br /> QUARTER LY POND INSPECTION REPORT <br />Operator: Powderhorn Ccal Com an Quarter: Fourth 2001 <br />Permit: C-81-041 Inspection Date: 21-Dec-01 <br /> Sawa a La oons <br />Pond Identiflcatlon <br />ype of Pond <br />Status During Inspection: Desl nand Actual De th from S Illwa Invert <br />Design Depth N/A N/A N/A N/A <br />Design Max Water Depth N/A N/A N/A N/A <br />Design Max Sed. Depth N/A N/A N/A N/A <br />Sediment Level N/A WA N/A N/A <br />Water Level D D D D <br />Outflow 0 0 0 0 <br />Features Problem Problem Problem Problem <br /> Yes/No Yes/No Yes/No Yes/No <br />Erosional <br />Rills & Gulleys Minor Minor Minor Minor <br />Inadequate Vegetation Yes Yes Yes Yes <br />Outlet Channel Erosion N/A N/A N/A N/A <br />Burrows No No No No <br />Other No No No No <br />Structural <br />Differential Settling No No No No <br /> <br />Seepage No No No No <br />Other No No No No <br />Appurtenant Structures <br />Defective Spillways WA N/A N/A N/A <br />Dewatering Devices Clogged WA N/A N/A N/A <br />Faulty Gates, Elc. WA N/A N/A N/A <br />Other Na No No No <br />Additional Comments Minor rills noted on the outslopes of the Cells. <br /> Vegetation on Cell outslopes is sparse. <br />Maintenance Required: Embankment on all Cells needs to be graded to smooth out erosional ~aLiEeS <br /> <br />Maintenance on the Cells will <br />be delayed until ~ <br />the sewage treat Ar~3Yst~ ~ ~Is',S Via, <br />~ <br /> re-activated. Reclamation will likely occur before the sytem ia~RCvated.= <br />~ ~'!,`~'r'. <br /> ~ <br />i ~•- ;;. <br />~~° ~ <br />Name of Inspector: Jim Stover ~ <br /> <br /> JeE. Stover ~~ <br /> ,~ <br />.~lgrado P. E. <br />1923f1~ate <br /> <br /> <br />O <br />• r ~ ~ <br />•aaa~ <br />Areation Eva oration Eva oration Eva oration <br />Cell 1 Cell 2 Cella Cell o <br />