Laserfiche WebLink
~. ~ <br />and should be monitored to assure that channels do not form. The highwall and other slopes at <br />the site appear stable. <br />As reported last quarter, it appears that waste material is being generated in larger amounts <br />that initially expected and hence the waste pile is approaching the final design volume <br />prematurely. <br />Except for the items mentioned above the fill on the waste pile has been constructed as <br />specified in the design approved by the Division of Minerals and Geology. <br />