My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-10-03_PERMIT FILE - M1997053
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1997053
>
1997-10-03_PERMIT FILE - M1997053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:09:04 PM
Creation date
11/20/2007 8:13:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997053
IBM Index Class Name
Permit File
Doc Date
10/3/1997
Doc Name
MINING & RECLAMATION PERMIT CONSTRUCTION MATERIAL MINING OPERATIONS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br />4) The Board, or its authorized representative may enter upon the lands of the permitted <br />operation at all reasonable times for the purpose of inspection to determine whether the provisions of the Act, <br />Rules and Regulations, and permit have been complied with pursuant to C.R.S. 34-32.5-121. <br />5) This permit may be revoked or suspended for non-compliance with the Act or applicable rules <br />or regulations promulgated by the Board, the permit, or by violation of a Board Order. <br />6) a) Pursuant to 34-32.5-118(5) of the Act, the Board has a right of entry to reclaim the lands <br />affected by the operation, or to respond to an emergency as defined by C.R.S. 34-32.5-121(2) <br />b) The Board will enter the lands to perform reclamation only if the Board has determined: <br />i. that reclamation required by law to have been performed upon such lands has not <br />been performed, and <br />ii. that financial warranty forfeiture proceedings described in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions se[ forth in the attached rider, if any, aze incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAE LONG <br />Division Director <br />M-AP-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.