Laserfiche WebLink
percent settlement (1 ft.), there will still be 1.6 feet of freeboard. <br />The entire embankment, including borrow areas, disturbed by construction <br />will be stabilized with respect to erosion by seeding the area immediately <br />after construction is complete. Areas in which the vegetation is not <br />successful or where rills and gullies develop, shall be repaired and <br />revegetated in accordance with Peabody's rill and gully plan. <br /> <br /> <br /> <br />7-6e-15 <br />