My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27593
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:01 PM
Creation date
11/20/2007 8:13:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
2/10/2005
Doc Name
January 2005 Monthly Report
From
Battle Mountain Resources Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE 11~OUNTAIN RESOURCES, INC. <br />February 07, 2005 <br />Mr. Tony Waldron <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc.v <br />San Luis Project <br />CMLRB Permit 1Vo. M-88-112 t/ <br />January 2005 Monthly Report d <br />Dear Mr. Waldron: <br /> <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRi), San Luis Project for the month of January 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) Plan. <br />Vacuum on the tailing lysimeters was verified on January 31~', no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers on <br />January 31", the West Pit and tailings embankment monitoring wells were collected on January <br />3151. The January 31 n tailing impoundment piezometer measurements identified these installations <br />were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and IysimeU.rs as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on January <br />31~`.The January tailings pond underdrain flow average was 40.0 gpm and a total of 1,150 gallons <br />of water was excavated iiom the leak detection system yielding a monthly average of 34.85 gpad. <br />During January, the West Pit water treatment plant operated efficiently discharging a total of <br />7,812,000 gallons (23.98 acre-feet} of water to Rito Seco Creek and a total of 470,200 gallons <br />(1.44 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage ~rlong Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for January was .98" inches, with the largest accumulation occurring <br />on January 28'" (.30"). <br />P.O. Box 310 San Lois, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.