Laserfiche WebLink
Table 4.8-8 cont. -page 3 <br /> 25-Yr, 24-Hr <br /> 10-Yr. 24-Hr Storm Event Stonn Event <br /> Peak Peak Effluent Peak <br />Sedimentation _ Spillway Stage (ft) Stage Storage Outflow Settleable Conc Stage Outflow Year <br />Pond Principal Emergency _ (fl) (ao-ft) (cfs) (ml/p (fl) (cfs) Built <br /> <br />Grouse #1 8.5 10.0 10.1 2.40 27.5 0.1477 10.3 64.4 1993 <br />Grouse #2 4.5 8.0 5.5 0,50 28.0 0.0643 B.0 64.2 1993 <br />Sage #1 8.0 10.0 8.8 3.42 15.5 0:0261 9.2 38.9 1994 <br />Sage #2 7.0 9.0 7.6 2,62 10.7 0.0005 8.0 -21.4 1994 <br />Oak#1 13.3 15.1 15.1 4,10 26.9 0.01 15.8 70.1 1998 <br />Oak#2 9.8 11.5 11.7 3,05 24.5 0.00 12.2 58.0 f996 <br />West Flume #1 10.0(3) 10.0(3) 12.1 3.11 31.5 0.00 12.7 59.4 1997 <br />r <br /> <br />~ Horse #1 14.0(3) <br />14.0(3) <br />15.8 <br />4.95 - <br />19.9 <br />0.00 <br />16.2 <br />44.8 <br />2000 <br />w <br />Middle Flume #1 11.7(3) 11.7(3) 12.9 2.00 26.7 0.10 13.3- 48.8 1999 <br />(1)(2)Middle Flume #2 15.5(3) 15.5(3) 18.3 10.21 187.5 1.4.76 19.1 307.3 2005 <br />Middle Flume #3 14.0(3) 14.0(3) 16.8 8.36 146.3 0.05 18.0 303.5 1998 <br />E. Mid. Flume #1 13.0(3) 13.0(3) 14.3 7.43 38.7 0.00 14.8 75.0 1999 <br />East Flume #1 11.3(3) 11.3(3) 12.5 3.55 7.3 0.00 13.0 19.5 2000 <br />West Horse 13.0(3) 13.0(3) 13.2 0.87 0.98 0.00 13.3 1:6 2004 <br />Deal #1 16.8(3) 16.8(3) 18.1 1.37 7.8 0.00 18.7 79.8 2008 <br /> <br />(1) Year built for future ponds may vary by ± two years. <br />(2) Designs will be sent to CDMG for approval prior to construction. <br />(3) Single open-channel design. <br />uPe~ae eroe <br />