Laserfiche WebLink
~ <br />• • ~iiiiiiiiiii-i-i-ii <br />~ <br />: ~TAT~ ~F COLOI~uy <br /> <br />DIVISfON Of MINERALS AND GEOLOGY III III'll I II IIII III <br />Di•parlmenl n( NaWral Resources 999 <br />Ill 3 Sherman SL. Roam 215 <br /> <br />Denver, G,Irnadn fl0!O} ~i~~ <br /> <br />Phone: p031 866 3567 I <br />FAX: 11011 flT!-8106 <br /> DEPARTMEf~fi' OF <br /> NATURAL <br /> RESOURCES <br />February 27, 1998 Roy Roma <br /> Governor <br />Mitch Albert, President Wmes 5 Lochhearl <br />Execuli~e D~recior <br />Agile Stone $ySlems. InC. Michael fl. Long <br />6435 South Pontiac Ct. Dmismn Direcbr <br />Englewood, CO 801 1 I <br />Re: Remaining Issues, Parkdale Project, File No. M-97-054 <br />Dear Mr. Albert: <br />The Division has completed its review of your amended Parkdale Project 1 l2 permit application. As I <br />discussed with you by phone today, there are 6 issues that we request you address as soon as possible. This <br />can be done by committing to incorporate the following list of items into your permit application. <br />1. Agile Stone Systems will mark the granite and sandstone quarry sediment control ponds to show <br />where the 5090 sediment storage area will be and clean the ponds when they reach that level, prior to <br />adding additional sediment. <br />2. Within 60 days of permit issuance, Agile Stone Systems will provide a written plan for testing various <br />mixtures of plant fines and topsoil as a reclamation plant growth medium. The location of the test <br />plots will be marked on the permit mining plan map. The most suitable mixture will be used in <br />accordance with the granite quarry reclamation plan. <br />3. Topsoil stripping will be limited to two (2) bench widths in the granite quarry and 100 feet in advance <br />of gravel extraction in the gravel mining areas. <br />4. Within 60 days of permit approval [he reclamation plan map will be modified to show the proposed <br />topography of the permanent visual noise berms. <br />5. The financial warranty (reclamation bond) shall be set at $276,700.00. <br />6. Blasting will be conducted in such a manner that airblast levels at the closet off-site residential <br />structures will be 134 decibels or less. Blasting records will be kept for 3 years for each quarry blast <br />and will be available for inspection by the Mined Land Reclamation Division. The blast records will <br />consist at a minimum of the following: <br />They must contain the name of operator conducting the blast. <br />They must include the location, date and time of the blast. <br />