Laserfiche WebLink
'- .~ . <br />_. ~ <br />4. Industrial discharges (industries, mines, gravel pits, water treatment plants, <br />etc.) <br />A. Description of facilities Aggregate Pit Mine <br />8. Principal product or raw material Aggregate <br />C. Maximum amount of rincipal product produced or raw material consumed <br />per day 500 tons oer day <br />D. Check the month(s) [he discharge occurs. <br />J~ f~ N Q A Q M~ J a J Q A a S~ O Q H~ 6 Q <br />E. Unit treatment processes utilized Settling Basin <br />F. Number of discharge points None <br />G. Description of discharge location(s): NA <br />N. Name of receiving water(s) Lone Tree Creek - Ephemeral <br />1. Is land application used or planned? NA <br />J. Attach any laboratory analyses of your effluent quality NA <br />5. Additional info rmatlon (sketches, etc.) <br />Process water from the sizing and washing plant will be <br />treated in a settling pond and will be recycled. <br />See attached mining plan map <br /> <br />* Discharge is not anticipated, should one occur as a <br />result of natural phenomena or flooding, the retention time ' <br />in the settling basin should be sufficient so that TSS <br />standards will not be exceeded at the spillway. <br />I certify Chat I am familiar with the information contained in the application and <br />that to the best of my knowledge and belief such information is true, complete, <br />and accurate. Please review signs cu re of application on instruction sheet before <br />signin . <br />Lee ~ucker <br />Printed Name of Person Signing <br />Owner <br />title <br />Date Application Si <br />$f"gnatu re of Applicant <br />