Laserfiche WebLink
• Table of Contents <br />1. Scope and Purpose ................................................................................... 1 <br />2. Mine Drainage Plan ................................................................................... 1 <br />2.1 Diversion of Uncontaminated Runoff ....................................................... 1 <br />2.2 Treatment of Yard Runoff ...................................................................... 2 <br />3. Drainage Basin Characteristics .................................................................... 3 <br />3.1 Basin Geometry and Soils ..................................................................... 3 <br />3.2 SCS Curve Number .............................................................................. 3 <br />4. Hydrology ................................................................................................ 5 <br />4.1 West Hillside Area ................................................................................ 5 <br />4.2 Peak Discharges and Volumes ............................................................... 6 <br />5. Drainage Structures .................................................................................. 6 <br />5.1 Pipes and Channels ............................................................................. 6 <br />5.2 Yard Drainage Routed to Ponds ............................................................. 7 <br />5.3 Drainage Structure Summary ................................................................. 7 <br />5.4 Rip-rap Design for the Eastside Drainage Channel ................................... 9 <br />• 8. Sediment Ponds .................. 10 <br />................................................................... . <br />6.1 Hydrology ............................................................................................ 10 <br />6.2 Watershed Sediment Yield .................................................................... 12 <br />6.3 Pond Geometry ......................................................................:............. 13 <br />6.4 Outlet Works and Trash Rack ................................................................ 13 <br />7. Topsoil Storage Pile Drainage .................................................................... 14 <br /> <br />January 1998 <br />