Laserfiche WebLink
a ATTACHMENTI <br />• SENECA COAL COMPANY <br />Seneca II-W MINE <br />NOTICE OF INTENT TO EXPLORE <br />Part II Supporting Documentation <br />ITEM 3 <br />All surface areas to be accessed during the exploration program is within the current II-W Mine <br />permit area and is either owned or leased by Seneca Coal Company. The applicable information is <br />included in the Seneca II-W Mine Permit Application Package in Tab 3, Adjudication File. <br />ITEM 4 <br />The locations of the proposed exploration sites are shown on Map 1, 2003 Exploration Program. A <br />description of the lands to be affected by this exploration program is included in the Seneca II-W <br />Mine Permit Application Package in: <br />• Tab 4, Premining Land Use <br />• Tab 7, Hydrologic Description <br />• Tab 9, Soil Baseline Study <br />• Tab 1Q, Vegetation <br />• ITEM 5 <br />S.a - Nazrative Description <br />SCC proposes to conduct coal exploration and verification investigations on property and coal <br />currently controlled by SCC (see discussion in Item 3). The purpose of the exploration is to verify <br />and determine the presence and continuity of the Wadge coal seam. <br />There are 19 exploration sites proposed. Sixteen of the proposed drill holes will be located adjacent <br />to existing roads or in permitted disturbance areas. The other three locations will require new <br />disturbance to access the sites. These sites are indicated on the attached Map 1, 2003 Exploration <br />Program. The new access routes will be field adjusted to reduce the amount of disturbance possible; <br />brush will be pushed aside and the ground leveled just enough to allow the drill rig to access the pad <br />location. Eight of the proposed drill pads (#2, #3, #4, #8, #10, #12, #14 and #1G)) are located <br />in watersheds without approved sediment ponds, SCC requests that these sites be approved <br />as Small Area Exemptions (Rule 4.05.2(3). The documentation/demonstration required for <br />SAE status is provided in Attachment lA, Hydrologic Documentation for Small Area <br />Exemption. <br />The typical drill pad for the exploration holes wiU be approximately 100 feet by 100 feet and <br />contain a 25-foot by 25-foot mud pit. The active drill pad will have a topsoil berm along the <br />upgradienx perimeter that will direct runoff from undisturbed areas around the outside of the <br />pad area. The remaining perimeter, except for access en[ry, will have an earthen berm and <br />ditch to contain all runoff from a 10-yr/24-hr storm event. A two-foot high berm will be <br />• constructed around the majority of the pad to control both surface water mn-on and run-off. <br />The down gradient berm will be constructed along contour. <br />To ensure that the run-off from a 10-yeaz, 24-hour event is contained, a containment ditch will <br />be constructed parallel to the down gradient berm as shown on attached Figure 1, Typical Drill <br />Pad in Attachment lA. The ditch will be approximately 2 feet deep with 1.SH:1V and 3H:1V <br />7 <br />