Laserfiche WebLink
. 2.05.5 <br />Post Mining Land Uses <br />(2) After the reclamation activities described in Section 2.05.4, Tab Section <br />14 are completed, the lands affected by surface operations and facilities <br />within the permit area will have been returned to their original pre-mining <br />condition, which, as described in Section 2.04.3, Tab Section 4, was "fish <br />and wildlife habitat" according to Rule 1.04(71)(h). <br />The close proximity of Public Service Company of Colorado's Cameo <br />Station, as well as the other industrial uses in DeBeque Canyon may <br />generate an interest in the post-mining land use being considered <br />"Industrial" far some areas. Prior to developing any of the reclaimed <br />sites into "industrial" final land use, revisions to this application will be <br />made. <br />• <br />Exhibits 6C through 12C., Tab Section 14 show the post-mining <br />topography of the lands affected by surface operations and facilities. <br />With the exception of the Colorado Mined Land Reclamation Board, no <br />other state or local agencies' authorizations are required to achieve the <br />post-mining land use described above. <br />15-1 (Rev. 12/16/86) <br /> <br /> <br />