Laserfiche WebLink
RECLANAT ION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cos[ (S) <br />_____~__I~_~~__~___________________________________..______I____.._______ <br />Subtotal (H): <br />[. EARTNNORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />Subtota( (I): <br />J. EARTNWRK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />________I___________________..______________________________ <br />1 ~ Strip Topsoil From 51 Acre Tract ~ <br />4 ~ Replace Topsoil in 66 acre Disturbance ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Lost (S) <br />535,036 <br />541.291 <br />Subtotal (J): 576,327 <br />