Laserfiche WebLink
• <br />n <br />U <br />• <br />COS7SUMMARY <br />(Updated 9/ 12/06) <br />Task List (Direct Costs) <br />NO. Task Description. Farm <br />Used Fleet <br />Size Task <br />Hours Direc! Cost <br />OOa Pit areablastin and radio NA 1 4030.06 $1,271,127 <br />OOb Roads/Trans ortaiion Route reclamation NA 1 718.71 $189,153 <br />OOc Reclaim surface water control strudures/wells NA 1 262.30 $232,713 <br />OOd R rade it remnantslfills NA 1 812.65 $258,645 <br />OOe Reestablish ostminin drains a control NA 1 2500.50 $1 393 481 <br />OOf Reclaim facilities area NA 1 226.33 $324,891 <br /> Site maintenance dudn liabil' clod NA 1 500.00 $215,902 <br />OOh To soil disturbed areas NA 1 3822.54 $3 012,516 <br />OOi Rev elate disturbed areas NA 1 2929.00 $1,816,705 <br />00~ Mobilize and demobilize reclamation a ui ment NA 1 64.00 $134,820 <br /> <br />Subtotals 15866.09 $8,849,953 <br />Total Dired Cost * _ $8,849,953 <br />Indired Costs <br />Overhead and Profit <br />Projed Management <br />Engineering Work and/or <br />Contract/bid preparation <br />Reclamation Management <br />And/or administration <br />Liability Insurance: 2.02 % of dived <br />Performance bond: 1.05 9'0 of dived <br />Job superintendent: NA NA <br />Profit: 10.00 % of dived <br /> Total O 8 P <br />CONTRACT AMOUNT (dived and O & P) <br />total = $178,769 <br />total = $ 92,925 <br />total = $100,124 <br />total = $884.995 <br />4.00 °h of Intr. NA <br />3.25 % of Intr. NA <br />TOTAL INDIRECT COST <br />TOTAL BOND AMOUNT <br />$1,256,813 <br />$10,106,766 <br />total = $404,271 <br />....total = $328,470 <br />_ $1,989,553 <br />_ $10,839,506 <br />The Division of Reclamation, Mining and Safety curren0y holds $11,673,859 in reclamation bonds for the <br />Seneca 11 Mine. As shown above, as of September 2006, the date the Cost Summary was prepared for <br />Technical Revision TR37, only $10,839,506 is necessary to reclaim the mine site. <br />MR-55 <br />13-55 <br />Revised 9/06 <br />