My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63707
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:48 PM
Creation date
11/20/2007 8:09:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977325
IBM Index Class Name
Permit File
Doc Name
COLORADO REFRACTORIES CORP CHEROKEE CLAY MINE PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' S~ EXHIBIT B <br />Mining Plan <br />' The current operator of this clay mine began his operation in ? <br />' The area mined since 1976 is indicated on the mining plan map. <br />Production quantities for the years 1974-1976 were used to determine area <br />' projection required for the mining plan. They are as follows: <br />1974 - 3,215 Tons <br />' 1975 - 2,192 Tons <br />1976 - 2,131 Tons <br />' The operator has indicated a projected recovery rate of approximately 2513 <br />tons per year. The average overburden is i8% comprised primarily of 4-8 inches of <br />tcpsoil and 3 to 8 feet of sandstone, overlying up to 28 feet of clay. Plaximum pit <br />~~ - <br />depths are on._th~order of 30 feet and typically are less than 20 feet. At <br />the above mentioned recovery rate it is projected that less than one surface acre <br />per year will be disturbed as a result of clay extraction. <br />The mining plan will consist of topsoil removal by front end loader and the <br />' stockpiling of the topsoil. It is anticipated that the stock out area for topsoil <br /> can be established in previously, mined areas. The clay will be excavated.._ta-an <br /> t <br />i <br />d <br />th <br />f~ <br />i t b <br />f <br />t <br />d l <br />d <br />hi h <br />l <br />h <br />t <br />l <br /> ma <br />e max <br />mum <br />ep <br />o <br />approx y <br />ron <br />en <br />oa <br />er w p <br />e ma <br />c <br />aces t <br />eria <br />' in dump trucks fcr delivery to a processing site operated in. Florence by Colorado <br /> Refractories Corporation. No wat er usage is anticipated at the mine site and no <br /> surface or ground water is retain ed except for short periods after heavy rains. <br /> Mining operations at this pit are intermittant and oc cur not more than 60 <br /> <br /> days of the year and only as this clay type is needed by the bri.:k factory in their <br />' operations. <br />As the mining progresses, and the topsoil can be redistributed, it will <br />' be redistributed according to the reclamation plan sited later herein. <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.