Laserfiche WebLink
.• e <br /> <br /> <br />Excavation will begin at point "A rind proceed North East <br />along the prominent ridge shown on the map, <br />Prior to excavation, topsoil will be removed and Stockpiled. <br />Then a tracked dozer will cut and push pit run to rubber tired <br />loaders, which will teed a portable crushing unit. <br />The material will be crushed for use in road building <br />projects and stoc4:piled on the site un[il they are needed. <br /> <br /> <br />