Laserfiche WebLink
Paragon Analytics <br />CONDITION OF SAMPLE UPON RECEIPT FORM <br />Client: ClrME.~ WorkorderNo: n50700°j <br />Project Manager: ,J M l; Initials: S L Date: 7. 16 S <br />t. Does this project require any special handling in addition to standard Paragon procedures? YES <br />2, Is pre-screening required per SOP 008? YES <br />3, Are custody seals on shipping containers intact? / YES NO <br />4. Are custody seals on sample containers intact? /A YES NO <br />s, Is there a COC (Chain-of-Custody) present or other representative documents? YES NO <br />6, Is the COC (if applicable) complete and legible? NIA YES NO <br />7, Are bottle IDs legible and in agreement with COC sample IDs? N/A YES NO <br />g. Is the COC in agreement with samples received? (# of samples, # of containers, matrix) N/A YES NO <br />y, Were airbills present and/or removable? N/A YE NO <br />10. Are all aqueous samples requiring preservation preserved correctly? (excluding volatile organics) / YES NO <br />II. Are all aqueous non-preserved samples at the correct pH? N/A YE NO <br />iz. Is there sufficient sample for the requested analyses? YE NO <br />13. Were all samples placed in the proper containers for the requested analyses? ~ NO <br />la. Are all samples within holding times for the requested analyses? S NO <br />15. Were all sample containers received intact? (not broken or leaking, etc.) YES NO <br />16. Are all samples requiring no headspace (vola$les, reactive cyanide/sulfide, radon), <br />headspace free? Size of bubble: _ < green pea _> green pea N/A YES NO <br />17 Were samples checked for and free from the presence of residual chlorine? <br />(Applicable when PM has indicated samples are from a chlorinated water source; note if Feld preservation with sodium <br />thiosulfate was not observed.) <br />1`I/A <br />YE$ <br />N~ <br />ig. Were the sample(s) shipped on ice? N/A YES NO <br />i9, Were cooler temperatures measured at 0.1-6.0°C? N/A <br />*IR un used (circle one 2 - Oakton InfraPro II, SN2922600201-0066; #4 - Oakton InfraPro II, SN2372220101-0002 <br />Cooler #'s / <br />Temperature (°C) 7. (o <br />No. of custody seals <br />s~NeYl External pR/hr reading <br />Acceptance <br />mrormauan Background µR/tu reading <br />Were external µR/hr readings S two times backgr°und and within DOT acceptance cri[eri YE / NO (If no, see Form 008.) <br />Anntnonal lnlOrmanOn: PROVIDE DETAILS BELOW FOA A NO RESPONSE TO ANY QUESTION ABOVE EXCEPT tkl AND tt2. <br />K <br />i< <br />•oS <br />9 <br />If applicable, was the client contacted? PE NO / NA Contact Name: ~z,., ~~~ Date/Time: <br />Project Manager Signature/ Date: <br />Form 201r18.xls (6126104) <br />Page 1 of ~ <br />~ r• o'~- sa sec rrr'ryerl ,31=~(~p~' 12. <br />