Laserfiche WebLink
Metals by 200.8 <br />Method EPA200.8 Revision 5.4 <br />Matrix Spike And Matrix Spike Duplicate <br />Lab Name: Paragon Analytics <br />Work Order Number: 0507009 <br />Client Name: CEMEX, Inc. <br />ClientProject ID: A * c Pits <br />?~ Sample Matrlx:WATER <br />PI75 <br />A <br />&Th <br />Me <br />d ID: Prep Batch: IP050711-24 Sample Aliquot: SOg <br />- <br />e <br />l <br />j <br />°,y Moisture: N/A <br />,~t <br />gCBetchID: IP050711-24-t <br />Final Volume: <br />50g <br />a LabID =f 0507009-3MS <br />i. Date Collected: 30~lun-OS Run ID: im050711-1 a2 Result Units: ugll <br />Date Extracted:ll-Jul-05 Cleanup:NONE File Name: 71JULOSA <br />Date Analyzed:li-Jul-O5 Basis: As Received <br />Prep Method: EPA200.2 <br /> <br />CASNO Target Analyte Sample Samp MS MS Reporting Spike MS % Control <br />Result Qual Result Qual Limit Added Rec. Limits <br />7782-49-2 SELENIUM 5.3 45.7 1 40 101 70 - 130 <br />7440.28-0 THALLIUM 0.24 1.3 0.2 1 105 70-130% <br /> <br />~ a """ - ~'-~--='~"`"' Sample Matrix: WATER <br />pp <br />Frejti ID A PIT SeBTh Prep Batch: IP050711-24 Sample Aliquot: 50g <br />---- { <br />~ <br />~ ~.~. r --- t % Moisture: N/A <br />blD 0507009 3MSD GG <br />DCBatchID:IP050711-24-1 <br />Final Volume: <br />50g <br />la <br />,:a«...., _ Date Collected: 30-Jun-OS RunlD:im050711-tat Result Units:ugll <br />Date Extracted: it-Jul-OS Cleanup: NONE Flle Name: 11JU L05A <br />Date Analyzed:llJul-05 Basis: As Received <br />Prep Method: EPA200.2 <br /> <br />CASNO Target Analyte MSD MSD Spike MSD % Reporting RPD RPD <br />Result Qual Added Rec. Limit Limit <br />77829-2 SELENIUM 46.5 40 103 1 20 2 <br />7440-28-0 THALLIUM 1.33 1 109 0.2 20 3 <br /> <br />Data Package ID: im0507009-1 <br />Date Printed: Thursday, July 14, 2005 Paragon Analytics Page 1 of 1 <br />LIMA Versl°n: 5.201A <br />11 <br />