Laserfiche WebLink
PARTI <br />Permit No. CO-0032638 <br />Page No. I S <br />D. SPECIAL REQUIREMENTS <br />2. Stormwater Requirements (continued) <br />Pittsburg and Midway Coal Company must implement the provisions of their SWMP as a condition of this <br />permit. The Division reserves the right to review the plan, and to require additional measures to prevent and <br />control pollution as needed. <br />SWMPs which met criteria contained in the previous version of this permit are acceptable. <br />The SWMP shall include the following items, at a minimum: <br />1) Descriution of Minine Activities <br />The plan shall provide a narrative description of the mining and associated activities that took place at the site. <br />The narrative description shall report the approximate dates of operation, the total acreage within the mine site <br />and an estimate of the number of acres of disturbed area. A general description of the location of the mining <br />site relative to major transportation routes and communities shall also be provided. <br />2) Site Mao <br />Each plan shall provide a generalized site map or maps which indicate any of the following which may be <br />applicable: <br />mining site boundaries and access and haul roads; <br />- areas used for storage of overburden, materials, soils, tailings or wastes; <br />- areas used for outdoor manufacturing, storage or disposal of materials; <br />- tailings piles and ponds; <br />- an estimate of [he direction(s) of surface Flow; <br />- existing structural control measures to reduce pollutants in Stormwater runoff; and <br />- springs, streams, wetlands and other surface waters. <br />3) Stormwater Management Controls -Identification of Sources and Best Manaeemenl Practices <br />The SWMP shall identify potential sources of pollutants at the site and assess the potential of these sources to <br />contribute pollutants to Stormwater discharges associated with mining activities. The SWMP must also describe <br />appropriate Best Management practices (BMPs) to reduce the potential of these sources to contribute pollutants <br />to Stormwater discharges. The appropriateness and priorities of controls in the plan shall reflect identified <br />potential sources of pollutants at the mining site. The description of the BMPs shall include: <br />a) Stormwater Diversion: Describe how and where Stormwater will be diverted away from potential pollutant <br />sources [o prevent Stormwater contamination. <br />b) Sediment and Erosion Prevention: Describe practices that will be used to reduce erosion and prevent <br />sediment delivery [o State waters. These could include structural (such as silt fences, sediment ponds, drop <br />swcmres, check dams) and non-structural (such as mulching and revegetation) methods. <br />4) Comprehensive Inspection <br />The SWMP shall identify qualified personnel that shall inspect designated areas. Inspections required by this <br />part shall be conducted annually. Where annual inspections are impracticable, certification is required once <br />every three years by a Registered Professional Engineer that the site is in compliance with the SWMP. <br />5) Additional SWMP Items for Sites Seekine Permit Termination <br />Additional requirements apply in the event that the permittee wishes to remediate the inactive mine site and <br />terminate permit coverage. If the site is already covered by this permit, the petminee shall notify the Division <br />as [o the change in status. Notification shall be prior to the implementation of the remediation work, if possible. <br />The SWMP must be amended [o include the following items, prior [o implementation of the remediation work, <br />if possible: <br />a) Documentation of Permission: The plan shall include documentation of permission from the land owner, <br />if the remediation work is undertaken by someone other than the land owner. <br />