Laserfiche WebLink
<br /> <br />Summary of Reelantation Cost Estimate <br />Western Mobile Northern <br />North Taft Hill Expansion Sile <br />File No. M2001-051 <br />August 14, 2001 <br />Task 1 Backfill Pond bank slope to 3h:ly $111,177 <br /> (621 f Cat Scrapers-two) <br />Task 2 Backfill pond separator dike 114,472 <br /> (621 F Cat Scrapers-two) <br />Task 3 Place 2 ft. topsoil on pond bank slope 9,796 <br /> (621 F Cat Scraper) <br />Task 4 Place 1 ft. topsoil on top on top of dikes 2,521 <br />Task 5 Rip buffer, overburden stockpile, top of dike and 1,073 <br /> bank slope topsoil areas (c-]4 cat multi shank ripper <br />Task 6 Place 1 ft. topsoil on buffer and overburden stockpile 9,890 <br /> Areas (621 F Cat Scraper) <br />Task 7 Revegetate pit/pond in slopes, stockpile locations, buffer 21.671 <br />Areas (Seed Mix 1) <br />Task 8 Revegetate adjust disturbance area and haul road 1,541 <br />(Farm equipment) <br />Task 9 Build ramps for scraper haul use (D-8 dozer) 3,250 <br />Task 10 Compact pond bank slope (Cat 825 G) 14,106 <br />Task I I Compact backfill in pond separator dikes 14,057 <br />Task 12 Mob-De Mob reclamation equipment (operator supplied 24,284 <br /> 8 % of Direct Costs) <br />Total Direct Cost 327,838 <br />Indirect Cost (18.5% of Direct Cost) 60,650 <br />Total Reclamation Cost 388,488 <br />Administrative Fee 5 90 (Rule 4.2.1(5)) 19,424 <br />Total $407,912 <br />Operator's recommended bond 470,124 <br />M:\osaWHDVdo\Summary of Reclamation cost m-2001-051 8-14-Ol.doc <br />