My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63591
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:42 PM
Creation date
11/20/2007 8:05:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001051
IBM Index Class Name
Permit File
Doc Date
8/16/2001
Doc Name
CHANGE DECISION DUE DATE NORTH TAFT HILL EXPANSION SITE FN M-2001-051
From
DMG
To
TST INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Summary of Reelantation Cost Estimate <br />Western Mobile Northern <br />North Taft Hill Expansion Sile <br />File No. M2001-051 <br />August 14, 2001 <br />Task 1 Backfill Pond bank slope to 3h:ly $111,177 <br /> (621 f Cat Scrapers-two) <br />Task 2 Backfill pond separator dike 114,472 <br /> (621 F Cat Scrapers-two) <br />Task 3 Place 2 ft. topsoil on pond bank slope 9,796 <br /> (621 F Cat Scraper) <br />Task 4 Place 1 ft. topsoil on top on top of dikes 2,521 <br />Task 5 Rip buffer, overburden stockpile, top of dike and 1,073 <br /> bank slope topsoil areas (c-]4 cat multi shank ripper <br />Task 6 Place 1 ft. topsoil on buffer and overburden stockpile 9,890 <br /> Areas (621 F Cat Scraper) <br />Task 7 Revegetate pit/pond in slopes, stockpile locations, buffer 21.671 <br />Areas (Seed Mix 1) <br />Task 8 Revegetate adjust disturbance area and haul road 1,541 <br />(Farm equipment) <br />Task 9 Build ramps for scraper haul use (D-8 dozer) 3,250 <br />Task 10 Compact pond bank slope (Cat 825 G) 14,106 <br />Task I I Compact backfill in pond separator dikes 14,057 <br />Task 12 Mob-De Mob reclamation equipment (operator supplied 24,284 <br /> 8 % of Direct Costs) <br />Total Direct Cost 327,838 <br />Indirect Cost (18.5% of Direct Cost) 60,650 <br />Total Reclamation Cost 388,488 <br />Administrative Fee 5 90 (Rule 4.2.1(5)) 19,424 <br />Total $407,912 <br />Operator's recommended bond 470,124 <br />M:\osaWHDVdo\Summary of Reclamation cost m-2001-051 8-14-Ol.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.