Laserfiche WebLink
~ ~ 1 <br />• <br />DIVISION 2 -SITE WORK <br />SECTION 02100 -SITE PREPARATION <br />PART1-GENERAL <br />I.OI WORK INCLUDED <br />• <br />Clearing trees and brush from the slurry wall alignmen[ and stripping upper soil layer to prepare for <br />placement of new impervious fill. <br />1.02 RELATED WORK <br />Section 02290 -Fill Area Construction <br />PART 2 -NOT USED <br />PART3-E%ECUTION <br />3.01 GENERAL <br />The Contractor shall, by their own investigation, determine the extent and effort of clearing required in <br />accordance with this section. <br />3.02 CLEARING AND GRUBBING <br />Clearing of the ground surface along the slurry wall alignment and in till areas will be a[ the direction of <br />the Engineer. The area to be occupied by the permanent construction required under these specifications <br />and the surfaces of all borrow pits, stockpiles, and fill areas shall be cleared of all trees, stumps, exposed <br />roots, brush, rubbish, and other objectionable matter as determined by the Engineer. <br />3.03 STRIPPING <br />The fill areas shall be s[ripped to a depth of 6 inches or to a sufficient depth, as determined by the <br />Engineer, to remove all unsuitable materials. The unsuitable materials to be removed by stripping shall <br />include all surface boulders and loose rock, debris, topsoil, vegetable matter, including stumps and roots, <br />and all other perishable and objectionable materials that are unsuitable far use in permanent construction <br />required under these specifications or that might interfere with the proper bonding of the embankment with <br />the foundation, or the proper compaction of the fill materials, or that may be otherwise objectionable as <br />determined by the Engineer. <br />3.04 DISPOSAL <br />Materials from clearing operations shall be removed from the construction site or otherwise disposed of as <br />approved by the Engineer. <br />Waste piles shall be located where they will not interfere harmfully with the natural flow of the stream and <br />drainage channels, with construction operations in the borrow areas, or with the operation of the reservoir. <br />Waste piles shall be leveled and trimmed to reasonable regular lines. <br />END OF SECTION <br />01 /99 <br />Section 02100 - Page I of I <br />