My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63585
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:42 PM
Creation date
11/20/2007 8:05:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000087
IBM Index Class Name
Permit File
Doc Date
9/14/2000
Doc Name
AGGREGATE INDUSTRIES INC MILLIKEN SITE REGULAR 112 ADEQUACY REVIEW M-2000-087
From
ROCKY MOUNTAIN CONSULTANTS INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Nothing contained herein is intended to imply that the Contractor does not have the right to have tests <br />performed on any material at any time for his own information and job convol so long as the Engineer <br />does not assume responsibility for costs or for giving them consideration when appraising quality of <br />materials. <br />1.03 TEST REPORTS <br />Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as follows: <br />I copy -Convector <br />I copy -applicable supplier or Subconvactor <br />I copy - Eneineer <br />Other copies - as directed. <br />1.04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and tests <br />of all items of work, including that of Subcontractors, to insure conformance to the Contract <br />Documents for materials, workmanship, construction, finish, functional performance and <br />identification. This control shall be established for all construction except where thz Contract <br />Documents provide for specific compliance tests by testing laboratories or the Engineer. The <br />Contractor's quality control system shall spzcitically include all testing required by the vazious <br />sections of the Specifications. <br />The Contractor's quality convol system is the means by which he assures himself that his <br />construction complies with the requirements of the Convect Documents. Controls shall be <br />adequate [o cover all construction operations and shall be keyed to the proposed construction <br />schedule. <br />END OF SECTION <br />01/99 Section 01400 -Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.