Laserfiche WebLink
<br /> <br />Nothing contained herein is intended to imply that the Contractor does not have the right to have tests <br />performed on any material at any time for his own information and job convol so long as the Engineer <br />does not assume responsibility for costs or for giving them consideration when appraising quality of <br />materials. <br />1.03 TEST REPORTS <br />Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as follows: <br />I copy -Convector <br />I copy -applicable supplier or Subconvactor <br />I copy - Eneineer <br />Other copies - as directed. <br />1.04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and tests <br />of all items of work, including that of Subcontractors, to insure conformance to the Contract <br />Documents for materials, workmanship, construction, finish, functional performance and <br />identification. This control shall be established for all construction except where thz Contract <br />Documents provide for specific compliance tests by testing laboratories or the Engineer. The <br />Contractor's quality control system shall spzcitically include all testing required by the vazious <br />sections of the Specifications. <br />The Contractor's quality convol system is the means by which he assures himself that his <br />construction complies with the requirements of the Convect Documents. Controls shall be <br />adequate [o cover all construction operations and shall be keyed to the proposed construction <br />schedule. <br />END OF SECTION <br />01/99 Section 01400 -Page 2 of 2 <br />