Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RKLAMATION, MINING AND SAFETY <br />Depanrtsent of Natural Resources <br />73}3 Sherman St., Room 275 <br />Denver, Colorado 80203 <br />Phone: (303) 0663567 <br />FAX: (3031832-8106 <br />RECEIVED ~~ <br /> COLORADO <br />FE608200i DIVISION or <br /> RECLAMATION <br />Division of Reclamation, MINING <br />Mining and Safety SAFETY <br /> Bill Owens <br /> Governor <br />CONSTRUCTION MATERIAL <br /> Russell George <br />LIMITED IMPACT (110) OPERATION Executive Director <br />RECLAMATION PERMIT APPLICATION PACKAGE Ronald w. Caaany <br /> Division Dnector <br /> Natural Resource Tnntee <br />APPLICABILITY': <br />This application package is for a construction material extraction operation affecting LESS than 10 acres. If you plan to conduct a <br />construction material extraction operation which meets these criteria, please follow the instructions provided in this package, un the <br />Rules and Regulations, and in the Colorado Land Reclattmtion Act for the Extraction of Construction Materials, as requirod. <br />RECOMMENDATIONS PRIOR TO FILING: <br />The Construction Material Rules and Regulations (the Colorado Lam Reclamation Act for the Extraction of Construction Materials, <br />Section 3432.5-101, et sew., C.RS., and 2 CCR 407-1), and the Colorado Mined Land Reclamation Board (the "Board") regulate the <br />permitting, operational and reclamation requiremnts for all construction material extraction operations in Colorado. It is your <br />obligation to comply with the Act and Regulations. You are trxotnaged to obtain and review a copy of the Rules, available for SS.00 <br />from dre Division of Reclamation, Mining and Safety (the "Office"). In order to submit your application properly, it is recomme-nded <br />that you review the Act and: <br />R7tle I.1 Definitions; <br />Rule 1.4 Application Review and Consideration Process; <br />Rule 1.6 Public Notice Procedures; <br />Rule 3.1 Reclamation Performance Standards; <br />Rule 3.3.1 Operating without aPermit -Penalty; <br />Rule 4 Performance Warranties and Financial Warranties; <br />Rule 6 Permit Application Exhibit Requirements; <br />Rule 6.2 General Requirements of Exhibits; <br />Rule 6.3 Specific Permit Application Exhibit Requiretnnts; <br />Rule 6.5 Geotechnical Stability Exhibit (as required). <br />It is reconnnended that you contact the agencies listed in the application section titled "Compliance With Odrer Laws" prior to <br />submitting the application to the Ofllce . <br />r7iFice of Offi:e of <br />