Laserfiche WebLink
WATERS OF U.S. <br />I <br />V / <br />I <br />�r <br />I ref <br />1 <br />OF U.S. <br />[ a <br />Q C3 <br />L= L <br />Cq <br />TOP OF LEVEE 18" CULVERT <br />4834 <br />& GATE [ <br />[ : <br />�.. <br />ir N <br />6 [ <br />° 3H:1V RESERVOIR [ ( <br />D n \ o m LINER <br />f II <br />Go <br />o° L A az <br />'— m . • 83 ` I . <br />RECHARGE POND <br />" ' —� • • • . �� . �� SE CORNER <br />SECTION 3 <br />-.-"- �,...�., .- -rte- -• - <br />RECHARGE POND OUTLET <br />TO EXISTING CULVERT <br />(INSTALL GATE/VALVE) <br />RECHARGE POND OUTLET CO'URnf ROAD 36 <br />TO EXISTING DRAIN L , , [ CIF GC, 0cr :) U a n4, <br />(INSTALL GATE/VALVE) <br />i <br />rc`\"n'F1T1QAL WHIM <br />N.T.S. <br />v L S '121Q .L- GEOUGH <br />N.T.S. <br />nIFISICAL- CUNT CLUBTIE 1 <br />L1 -MIU : <br />EXISTING CONTOURS <br />1 -25 r EXISTING FLOWLINE <br />EXISTING FENCELINE <br />EXISTING PAVED ROADS <br />EXISTING DIRT ROADS <br />EXISTING VEGETATION <br />EXISTING UTILITY POLE <br />PROPERTY BOUNDARY <br />4820 PROPOSED CONTOURS <br />100 YEAR FLOODWAY <br />ap TYPICAL PLANT CLUSTER <br />— — - -- ---- PROPOSED GROUNDWATER COLLECTION TRENCH <br />RE- ROUTED BOXELDER DITCH <br />Q PERMIT BOUNDARY <br />L&HIMMITE MAR <br />TREES (minimum of 100, no more than 25% of any one species) <br />AUSTRIAN PINE (Pinus nigra) MIN. 5r TALL <br />WICHITA JUNIPER (Juniperus scopulorum 'Wichita Blue') (5 GALLON CONTAINER) <br />WESTERN CATALPA (Catalpa speciosa) 15 -2" CALIPER <br />MARSHALL ASH (Fraxinus pennsylvanica 'Marshall') (BALLED & BURLAPPED) <br />RED SUNSET MAPLE (Acer rubrum 'Red Sunset') <br />SHRUBS (minimum of 100, no more than 50% of any one species) <br />COMMON PURPLE LILAC (Syringe vulgaris) <br />BLUE PFiTZER JUNIPER (Juniperus chinensis 'Pfitzeriana Glauca') (5 GALLON CONTAINER) <br />RED TWIG DOGWOOD (Corpus sericea 'Bailey') <br />SEEDING <br />Thinspike wheatgrass (Critana) 5% #PLS /AC. <br />Side -oats gramma (Vaughn) 2% #PLS /AC. <br />Switchgrass (Nebr. 28) 11(2 #PLS /AC <br />02 #PLS /AC. TOTAL <br />SCARIFIED PRIOR TO THE <br />PLACEMENT OF FILL MAT] <br />ALL WEATHERED BEDROCI- BE EXCAVATED AND REMOVED <br />FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALT. <br />BE REMOVED UNTIL COMPETENT <br />BEDROCK (AS DETERMINED BY <br />THE ONSITE ENGINEER) IS <br />EXPOSED. <br />NOTES: <br />1. Planting of trees and shrubs will be irregular <br />clusters of 5 trees and shrubs each. <br />2. Tree and shrub selection will be random from <br />the listed plant materials. <br />3. Berms will average 4 to 5 feet in height and <br />40 to 70 feet in width as shown on the plan. <br />4. Landscaping along south and west boundaries <br />to be completed prior to Phase 4 mining. <br />5. All plant material must be balled & burlapped <br />or container grown. Bare root planting is <br />allowed, but discouraged. <br />P_ <br />zl�� z i WE <br />00 W <br />N.T.S. <br />EARITC; CrITIO 1[t HarEs <br />1. Each layer of fill shall be scarified to allow 4. An 815 or 825 sheepsfoot roller will be <br />proper bonding between layers. used for compacting efforts. <br />2. Density and moisture content testing shall 5. The clay liner material shall be mixed in <br />be done at a rate of 1 test for each the embankment at the ratio of 4 parts <br />2000 yards placed. clay overburden (CL) to 1 part siltstone <br />bedrock. <br />3. All clay liner material shall be compacted <br />to a minimum 95% ASTM- D698 -78 Standard 6. The clay liner material shall be placed in <br />Proctor at t2% of optimum moisture content. a 9" (max.) loose lift prior to compaction. <br />r <br />GRADE <br />RECHARGE 3 <br />POND 1I � <br />12.0' <br />COMPACTED <br />CLAY LINER <br />10.0' <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />2.0' GRAVEL <br />3 MINE <br />�,_ 7 1 <br />BEDR&K" SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />T <br />LLJ <br />0' <br />WE <br />I' <br />LJ <br />off- <br />`-f <br />L <br />RECEIVED <br />SEP 12 2001 <br />Division of <br />Minerals and Geology <br />Drawn: <br />C <br />Design: <br />KES <br />Checked: <br />DPG <br />Scale: <br />to <br />7 <br />vu C <br />C <br />i� <br />S <br />w <br />E <br />ca <br />J. <br />� <br />IM <br />C <br />� <br />C <br />C� t <br />O <br />� <br />TS <br />C <br />w <br />�+ <br />C <br />oD <br />�Cal= <br />CN <br />G <br />a $ <br />P" <br />Y <br />W W i <br />N.T.S. <br />EARITC; CrITIO 1[t HarEs <br />1. Each layer of fill shall be scarified to allow 4. An 815 or 825 sheepsfoot roller will be <br />proper bonding between layers. used for compacting efforts. <br />2. Density and moisture content testing shall 5. The clay liner material shall be mixed in <br />be done at a rate of 1 test for each the embankment at the ratio of 4 parts <br />2000 yards placed. clay overburden (CL) to 1 part siltstone <br />bedrock. <br />3. All clay liner material shall be compacted <br />to a minimum 95% ASTM- D698 -78 Standard 6. The clay liner material shall be placed in <br />Proctor at t2% of optimum moisture content. a 9" (max.) loose lift prior to compaction. <br />r <br />GRADE <br />RECHARGE 3 <br />POND 1I � <br />12.0' <br />COMPACTED <br />CLAY LINER <br />10.0' <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />2.0' GRAVEL <br />3 MINE <br />�,_ 7 1 <br />BEDR&K" SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />T <br />LLJ <br />0' <br />WE <br />I' <br />LJ <br />off- <br />`-f <br />L <br />RECEIVED <br />SEP 12 2001 <br />Division of <br />Minerals and Geology <br />Drawn: <br />CJC <br />Design: <br />KES <br />Checked: <br />DPG <br />Scale: <br />to <br />L <br />IM <br />C <br />Date: <br />9/10/01 <br />Job No: <br />01 -198 <br />Drawn: <br />CJC <br />Design: <br />KES <br />Checked: <br />DPG <br />Scale: <br />1" = 200' <br />' Sheet: <br />1. Berm location and alignment may be shifted north u <br />as needed' without floodway Impact. PermaN bar til- t119_05_0 <br />Class: Permit <br />2. Berm elevation may be higher than indicated if Section/Exhibit / CzeI JO�Sd�vt PpCP k <br />Y 9 -- - - -- L�- 1----------- - - - -°�- , <br />Class: l7 Revision <br />extra overburden materials are available <br />Ty -- ---- <br />Class: 13 3. Berm width may be wider than indicated without Doc TypeRepo t Hydro ❑General <br />floodway impact if elevation is not above existing ❑Application (Coal only) ❑ Bond D Enfo cement O Inspect on ------ - - - --- <br />ground to the south <br />[ Of.. <br />0 <br />o0aa3 <br />