Laserfiche WebLink
PBRIODIC INSPBCTION PORM <br />Stockpoadc or Bumps <br />INSPECTOR'S NAME: BCIy Raro <br />FACILITY CONFIGURATION: Stec fiend <br />SITE NAME: T-30 <br />MINE NAME: ceneca 77 <br />MINE I.D. NO.: c-80-005 <br />DATE: 03/24/99 <br />DATE LAST INSPECTION: 12/15/98 <br />LOCATION: SWS~NW3~ Sec 1 TSN RB7W <br />LOCATION: 7.t mi cE of Hayden, CO <br />OWNER'S REP.: Brad Brown, Gen Mqr <br />1. Angle of elope: 4:1 upstream, a:1 downstream Total = 8e1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment elopes: Yee ® N/A <br /> At natural hillside: Yee N/A <br /> Over widespread areas: Yee ~ N/A <br /> From downstream foundation area: Yee ~ N/A <br /> "Boils" beneath stream or ponded water: Yee o N/A <br />3. Cracks or scarps on treat: Yee o N/A <br />4. Cracks or scarps on elope: Yee ® N/A <br />5. Sloughing or bulging on elope: Yee ©o N/A <br />6. *Major erosion problems: Yee ® N/A <br />7. Surface movements in valley bottom or on hillside: Yee ~ N/A <br />8. *Erosion of toe: Yee i~ N/A <br />9. *Water impounded against downstream toe: Yee ~ N/A <br />10. Existing embankment freeboard: Annreximately ~ feet <br />11. Increase Decrease in water level: No change f <br />e <br />e <br />t <br />12. Cracks, bulging, or erosion on upstream face: Yee / <br />~^ <br />~ N/A <br />13. Spillway erosion: Yes ~ <br />o N/A <br />14. *Clogging <br /> Spillway channels: Yee ~ N/A <br /> Diversion ditches: Yee N N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />