My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27481
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:51 PM
Creation date
11/20/2007 8:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
4/27/1999
Doc Name
SENECA II MINE C-80-005 QUARTERLY STOCKPOND INSPECTIONS
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockpoadc or Sumps <br />INSPECTOR'S NAME: RGiy_I(are <br />FACILITY CONFIGURATION: Stoc Pend <br />SITE NAME: T-25 <br />MINE NAMES Seneca TT <br />MINE I.D. NO.: o-80-005 <br />1 <br />2 <br />3. <br />4. <br />5. <br />6. <br />7. <br />DATE: 03/24/99 <br />DATE LAST INSPECTION: ? ~/] 5./4g <br />LOCATION: 9$'kSE3. Sec 2,~'SN R97W <br />LOCATION: 7.1 mt Sn`. of Hayden GO <br />OWNER'S REP.: Brad 8rewn. Gen MQr <br />Angle of elope: 3:1 upstream, a:i downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />Cracks or scarps on treat: <br />Cracks or scarps on elope: <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />8. "Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: A~ereximately <br />11. Increase Decrease in water level: Ne change <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee No N/A <br />Yee ~ N/A <br />Yee No N/A <br />Yee Q N/A <br />Yee ~ N/A <br />Yee ® N/A <br />Yee No N/A <br />Yee ©o N/A <br />Yee ® N/A <br />Yee N/A <br />Yes N N/A <br />Yee N N/A <br />~_ feet <br />feet <br />Yee Ic N/A <br />Yee N N/A <br />Yes N/A <br />Yee N N/A <br />•Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 7e1 N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.