Laserfiche WebLink
PERIODIC INSPBCTION FORK <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: Roy xa ro <br />FACILITY CONFIGURATION: atoek~nend <br />SITE NAIL: T-7 <br />MINE NAME: senses ii <br />MINE I.D. NO.: C-RO-005 <br />DATE: 03/x/99 <br />DATE LAST INSPECTION: _12/15/99 <br />LOCATION: sE3ICWt, a_ee 2 TSN RR7W <br />LOCATION: 7.1 mi c_E of Raydanf CO <br />OWNER'S REP.: Brad Rrewn Can MQr <br />1. Angle of elope: 3:1 upstream, a:1 downstream Total = 2:L N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment elopes: Yee ~ N/A <br /> At natural hillside: Yes ~ N/A <br /> Over widespread areas: Yee N N/A <br /> From downstream foundation area: Yee ~ N/A <br /> "Boils" beneath stream or ponded water: Yee ~ N/A <br />3. Cracks or scarps on crest: Yee N/A <br />4. Cracks or scarps on elope: Yee N/A <br />5. Sloughing or bulging on elope: Yee N/A <br />6. *Najor erosion problems: Yes ~ N/A <br />7. Surface movements in valley bottom or on hillside: Yee ~ N/A <br />8. *Eroeion of toe: Yee ® N/A <br />9. *Water impounded against downstream toe: Yee ® N/A <br />10. Existing embankment freeboard: ATnresimataty ~ feet <br />11. Increase Decrease in water level: No change feet <br />12. Cracks, bulging, or erosion on upstream face: Yee ~ N/A <br />13. Spillway erosions Yee ~ N/A <br />14. *Clogging <br /> Spillway channels: Yee 1~Q N/A <br /> Diversion ditches: Yes o N/A <br />*Najor adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions <br />noted in these items should normally be described (extent, location, volume, etc.) in the <br />apace on the back of this sheet. <br />