My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27481
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:51 PM
Creation date
11/20/2007 8:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
4/27/1999
Doc Name
SENECA II MINE C-80-005 QUARTERLY STOCKPOND INSPECTIONS
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPBCTION FORK <br />Stockpoade or Sumps <br />INSPECTOR'S NAME: Roy[ xarn <br />FACILITY CONFIGURATION: Stnc cnd <br />SITB NAME: T-B <br />MINE NAME: Seneca ii <br />MINE I.D. NO.: c-80-005 <br />1 <br />2 <br />DATE: Oj./24/99 <br />DATE LAST INSPECTION: ~/tc/98 <br />LOCATION: NF.dj&Wl.. cec 12 TSN. RB7w <br />LOCATION: 7.1 m± _cR of Hayden c0 <br />OWNER'S REP.: Hrad Rrown, Gen MQ~ <br />Angle of elope: ~:t upstream, 3_s:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or ecarpe on treat: <br />4. Cracks or ecarpe on elope: <br />5.~ Sloughing or bulging on elope: <br />6. *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: ATprox imate ly <br />11. ~ Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />16. *clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee ~ N/A <br />Yee ~ N/A <br />Yee ® N/A <br />Yee U N/A <br />Yee ® N/A <br />Yee ~ N/A <br />Yee ® N/A <br />Yee ® N/A <br />Yee ® N/A <br />Yee ~ N/A <br />Yee ® N/A <br />Yee ® N/A <br />~ feet <br />~ feet <br />Yes ©o N/A <br />Yee ® N/A <br />Yee ~ N/A <br />Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 6 S•t N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.