Laserfiche WebLink
• LIST OF TABLES <br /> Table No. Paoe <br /> 1.2-1 Pernik and Licenses for Surtace Mining and ReGamation Operations at 1-9 <br /> Trapper Mine <br /> 1.2-2 Pernits and Licenses for Surtace Mining and Reclamation Operations for 1-t t <br /> Affiliate Coal Operations, held by the principal shareholders of Trapper <br /> Mining Inc. <br /> 1.41 Summary of costs for Trapper Mine Bond Determination 1-32 <br /> 1.42 Summary of Regrede Costs 1-34 <br /> 1.43 Calculations for Time Required to Regrede Pits 1-35 <br /> 1.44 Calculations for Time Required to Regrede Roads 1-38 <br /> 1.45 Calculations for Time Required to Regrede Impoundments 1-37 <br /> 1.48 Calculations for Time Required to Regrede D'nrersions 1-39 <br /> 1.47 Summary of Topsoil Replacement Costs 1-42 <br />• ili <br />l <br />l <br />i <br />f <br />Ti <br />R <br />i <br />d f <br />R <br />t 1 <br />43 <br /> 1.48 ng <br />Ca <br />cu <br />at <br />ons <br />or <br />me <br />equ <br />re <br />or <br />e <br />opso - <br /> 1.49 Summary of Revegetation Quantities and Cost Calculations 1-54 <br /> 1.410 Produdion, Material and Tolal Revegetation Costs by Revegetation 1-55 <br /> Treatment with a Total Revegetation Cost for each of the Three <br /> Land Use Types <br /> 1.411 Revegetation Treatment Sequencing and Associated Produclion Costs 1-56 <br /> per Acre Excluding Topsoiling <br />- . 1.412 Equipment and Operator Cosl F_stimates for Revegetation Work 1-57 <br /> 1.413 Current Local Revegetation Material Cost 1-58 <br /> 1.414 Change in Disturbance to Determine Worst Case Year for Bond 1-59 <br /> 1.415 Miscellaneous Costs 1-59a <br />. 6197 <br />lii-1 <br />MAY 1 3 1998 <br />