Laserfiche WebLink
<br />5. Monitoring Reclamation Success <br />:J <br />• Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local SCS office in Rio Blanco County to assist in deter- <br />mining the ability of the reclaimed land to control erosion. If minor changes or modifications are <br />needed to the seeding and reclamation plan, revision plans will be submitted to the Division as <br />required. I[ is hoped that the Division will provide assistance in evaluating the success of the ongo- <br />ing reclamation process. All areas disturbed and reclaimed and any other important items regarding <br />the reclamation will be submitted in the annual reports to the Division. <br />• <br />• <br />Piceance Pit 7101 2$ <br />