My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63413
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:32 PM
Creation date
11/20/2007 7:59:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001077
IBM Index Class Name
Permit File
Doc Date
7/26/2001
Doc Name
PICEANCE PIT 110 PERMIT APPLICATION TO DMG & GEOLOGY & RIO BLANCO CNTY COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CJ <br />• <br />• <br /> <br />Worst Case Reclamation Costs and Timetable <br /> <br />Task # Description Time (days) Cost <br />1 After removing all portable facilities, spread top- 21 $36,945 <br /> soil on reclaimed area and lake shore from stock- <br /> pile (42,960 cy) Avg. push dist = 270 feet @ -2% <br /> grade. Use D-8 w/universal blade. Cost is <br /> $0.86/cy. <br />2 Spread topsoil from east 2' berm (200 cy). Use 4 $2,280 <br /> Cat D8 - $114(hr x 20 hrs. <br />3 Final grading and harrowing of topsoil, upper 5 $3,800 <br /> zone only, (10000 cy @ $0.38/cy). <br />4 Seed & mulch wetland (0.45 acres @ $3500/acre) 2 $1,575 <br />5 Seed, mulch, fertilize (5.28 acres@ $700/acre) 2 $3,696 <br /> Drill seed on flat areas. Mulch a13000 Ibs per <br /> acre. <br /> Total Direct Costs 34 days $48,296 <br /> DMG Costs (19.5% x direct costs) $9,418 <br /> Total Bond Amount $57,714 <br />There ate no costs for removal of equipment since there will be no permanent equipment, structures <br />or foundations within the permit area. DMG overhead consists of contractor profit, bid preparation, <br />etc and are estimated at 19.5% of direct costs. <br />Map Exhibit E-2 shows the site after full reclamation. The cross-section lines A and B are used to <br />show the original and final topography. These cross-sections are given on small sheets in Appendix <br />B. <br />Piceance Pit 7/01 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.