MINING PLAN EXHIBIT C <br />• 1. General Plan <br />The property boundary has been surveyed on site and the permit area will be surveyed prior to any <br />site disturbance. Map E-1 and should be acceptable to the Trails 2000 club as well as Rio Blanco <br />County. <br />Prior to any mining operations, the sediment control system will be installed, which consists of a 30 <br />feet high berm made of topsoil on the south side of the property, which is meant to isolate runoff <br />water on and off the site. A 2 feet high topsoil berm will be placed on the east side of the permit area <br />for the same purpose. The berms will also contain the runoff from the 100 year - 24 hour event <br />within the permit area. If a 100 year flood occurs, the berms should isolate the permit area from the <br />rest of the floodplain, even though the majority of the permit area is within the 100 year floodplain. <br />The berms also serve the purpose of temporarily storing the topsoil from the mine pit and facilities <br />areas. All sideslopes for the temporary piles will be 2.OH1.OV. Once mining is terminated, these <br />piles will be graded back into the lake to help create shelf wetlands. <br />As shown on Map E-1, the plan of operation is to initially strip the topsoil from the mining area and <br />the facilities area, which is approximately 8.07 acres. This material is expected to average 3.3 feet <br />in thickness, therefore the volume to be moved is 42,960 cubic yards. The topsoil stockpile area al- <br />located at the southern end of the permit area as shown on the map. The topsoil stockpile will have <br />an average height of 25-30 feet and will be seeded immediately with the seed mix described in the <br />reclamation plan or any other mix deemed appropriate by the Division. No slopes of the stockpile <br />will exceed 2.OH:1.OV. The south pile at a height of 30 feet and a length of 670 feet will hold 44,666 <br />cubic yards, therefore, the pile area is adequate. <br />A Cat D-8 or D-9 dozer is expected to perform the stripping and stockpiling. Scrapers could also be <br />used. <br />Once this work is completed, the excavation of gravel will begin to allow dewatering of the pit. A <br />D-8 or D-9 dozer and/or Cat type 988 loader will be used to push or carry the gravel to the pit facili- <br />• <br />Piceance Pit 7/01 13 <br />