Laserfiche WebLink
_~ `' PEABODY <br />,VIIESTERN, <br />RF~c-~~~-,.. <br />.~~~ ~ O ~ <br />n <,, „^,n,,,. <br />. ~,.. <br />~;co,. <br />14s. Janet H. Binns <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />I~~ I~II~~I~IIIII'~~ <br />Peabody Western Coal Company <br />June 13, 1994 <br />RE: Quarterly Sedimentation Pond Inspections - Hayden Gulch <br />Loadout <br />Dear Ms. Binns: <br />Enclosed is the second quarter inspection for Ponds 001 and 002 <br />at the Hayden Gulch Loadout. All conditions appeared stable and <br />acceptable. <br />If you have any questions, please call me. <br />bd <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />Sincerely, <br />~(/~//J `mil/ ~~~ <br />~~ J. Wainwright, P.E. <br />Senior Engineer <br />Peabody Wezlem Coal Company • 1300 South Tale Sheet • Flagzta(F, Arizona 86001 • Telephone (607) 774-373J • Fax (607) 771-4596 <br />./!,// <br />