Laserfiche WebLink
iii iuiiiiiiiiuiii <br />E~~A <br />SCoalCompany Seneca Coal Company <br />November 30, 1999 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Yoast Mine <br />Dear Mr. Boulay: <br />Enclosed is the third quarter inspection reports for Ponds 010, <br />011, and 012 at the Yoast Mine. The construction of pond 012 has <br />been completed. The as-built survey has been conducted and the <br />accompanying as-built report is currently being prepared and <br />will be forwarded shortly to the Division for inclusion in the <br />permit package. Conditions appeared stable and acceptable. <br />If you have any questions, please call me <br />Sin <br />Mich~,`~,G'`6,;,~~t~la, P.E. <br />Engin S~qQ ® er <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />~©~ 3 0 199 <br />Seneca Caal Company • P.O. Drawer D • Hayden, Colorado 87639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />