My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27430
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:48 PM
Creation date
11/20/2007 7:58:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Hydrology
Doc Date
5/27/1992
Doc Name
CDPS GENERAL PERMIT FOR COAL MINING FACILITIES AUTHORIZATION TO DISCHARGE UNDER THE COLO DISCHARGE P
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 15 <br />Permit No. COG-850000 <br />C. REPORTING REQUIREMENTS <br />b) Chaagac to authorizatioa. If an authorization under paragraph a) of <br />this section ie no longer accurate because a different individual or <br />position has responsibility for the overall operation of the <br />facility, a new authorization satisfying the requirements of <br />paragraph a. of this section moat be submitted to the Division, prior <br />to or together with any reports, information, or applications to be <br />signed by an authorized representative. <br />c) Certification. Any person signing a document under paragraph a) of <br />this section shall make the following certifications <br />"I certify under penalty of law that this document and all <br />attachments were prepared under my direction or supervision in <br />accordance with a system designed to assure that qualified personnel <br />properly gather and evaluate the information submitted. Based on my <br />inquiry of the person or persona who manage the system, or those <br />persona directly responsible for gathering, the information submitted <br />ie, to the beet of my knowledge and belief, true, accurate, and <br />complete. I am aware that there are significant penalties for <br />submitting false information, including the possibility of fine and <br />imprisonment for knowing violations.' <br />PART II <br />A. MANAGEMENT REQUIREMENTS <br />1. Change in Discharge <br />The permittee shall inform the Division (Permits and Enforcement <br />Section) in writing of any intent to construct, install, or alter any <br />process, facility, or activity that ie likely to result in a new or <br />altered discharge, and shall furnish the Division such plane and <br />specifications which the Division deems reasonably necessary to evaluate <br />the effect on the discharge and receiving stream. <br />The permittee shall submit this notice within two (2) weeks after making <br />a determination to perform the type of activity referred to in the <br />preceding paragraph. Process modifications include, but are not limited <br />to, the introduction of any new pollutant not previously identified in <br />tfie permit, or any other modifications which may result in a discharge <br />of a quantity or quality different from that which was evaluated in the <br />drafting of the permit including subsequent amendments. Following such <br />notice, the permittee shall be required to submit a new CDPS application <br />and this application may be processed as an application for an <br />individual permit if the application shows that the new discharge ie <br />ineligible for coverage under the general permit. in no case shall the <br />permittee implement such change without first notifying the Division. <br />Amended 1(1/11/94 Effective l~/izioi <br />
The URL can be used to link to this page
Your browser does not support the video tag.