Laserfiche WebLink
(il (Al Location: <br />• (Bl Plans of the structure which describe its current condition; <br />(Cl Arororoximate dates on which construction of the existing structure was begun and <br />comroleted: and <br />(Dl A showing, including relevant monitoring data or other evidence, whether the structure <br />meets the desim reouirements or performance standards of Rule 4 or is eligible for <br />exem~ttion from the design requirements as set forth in 2.07.6. <br />(iil A compliance plan for each existing structure that is proposed to be modified or <br />reconstructed for use in connection with or to facilitate the surface coal mining and reclamation <br />operation. The compliance plan shall include: <br />(Al Design sroecifications for the modification or reconstruction of the structure to <br />meet the requirements of these Rules: <br />(Bl A construction schedule which shows dates for beginning and competing interim <br />steps and fmal reconstruction: <br />(Cl Provisions for monitoring the structwe during and after modification or <br />reconstruction to ensure that the performance standards of these Rules aze met: and <br />(Dl A showing that the risk of harm to the environment or to public health or safety is <br />not significant during the period of modification or reconstruction. <br />• RESPONSE <br />All existing structures have been constructed in accordance with CMLRD Permit No. C-82-056, approved <br />April 16, 1984, and associated revisions. Rule 2.05.3(3), Mine Facilities, describes modifications on <br />reconstruction of buildings and coal handling facilities planned under this permit revision. In light of the <br />fact that all modifications or reconstructions will be conducted on previously affected surface azeas within <br />the present permit boundary, significant harm to the environment or the public health or safety is not <br />anticipated to occur during the period(s) of modification or reconstruction as described above. <br />The Fish Creek Tipple is located in Section 2, Township 5 North, Range 86 West, as shown on Map 15 of <br />the Fish Creek Tipple/I,oadout Appendix, Volume Di;. The structures associated with the tipple operation <br />aze discussed in greater detail within Rule 2.05.3(3) of Volume VII. <br />• <br />MROS-201 2.05-65.5 10/03/05 <br />