My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27417
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27417
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:48 PM
Creation date
11/20/2007 7:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
6/15/1979
Doc Name
MEMO MINING PLAN BLUE RIBBON MINE COAL LEASE C-033301 SUNFLOWER ENERGY CORP SUBLESSEE
From
USGS
To
OSM
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />t~ <br /> <br />• • III IIIIIIIIIIIIIIII <br />999 <br />United States Department of the Interior <br />GI((lLI1GICA1. til1K~'F1' <br />Box°5u46 stop 602 c-03330] <br />_ llcnvcr Fcdl•ral Ccm rr <br />Ilc uv cr, Colorado RO'1or, <br />t <br />June 13, 1979 <br />Plemorandum <br />To: Regional Director, Office of Surface Mining, Denver, CO <br />Attn: John Hardaway <br />From: Acting Area Mining Supervisor, CRMA <br />Subject: Mining plan, Blue Ribbon Mine, coal lease C-033301, <br />Sunflower Energy Corporation (sublessee) <br />This office has reviewed the mining and reclamation plan dated <br />May 21, 1979, for the underground Blue Ribbon mine as to the <br />development, production and resource recovery and protection. <br />To make the plan of mining operations satisfactory, the following <br />information is needed: <br />Narrative Section - Minine Plan <br />Discuss development of the main entries giving number of <br />entries, entry widths and centerline distances. <br />Discuss development of panel entries off the main entries, <br />giving sequence of development and mining of the panels. <br />Discuss typical plan for mining coal within the panels. <br />Will rooms be mined on both sides of panel entries or one side <br />only? Will rooms be mined by advance or retreat mining methods? <br />Give rationale for 60-foot wide panel barrier pillars <br />(40- to 50-foot width Ss usually adequate). <br />Give average planned rate of production, daily and anmlally. <br />Mine Layout Map <br />IN kF.l'LY Il l: Flak TU <br />The mine plan map should show all the measurements for <br />development of the main entries, panel entries, rooms and barrier <br />pillars. The map should show sequence of developing panel entries, <br />sequence of mining panels and a typical plan for room and pillar <br />mining of a panel. The plan should designate areas to be mined <br />annually for at least [he first 5 years of operations. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.