Laserfiche WebLink
• iii iiiiiiiiiiiu iii <br /> , <br /> <br /> STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />oe; cor <br />Division of Water Resources o~ <br />R~; <br />Department of Natural Resources ~: o <br /> <br />1313 Sherman Street, Room 818 <br />•~ <br />~ <br />Denver, Colorado 80203 • <br />Phone: (3031 866-3581 <br />FAX: (303) 866-3589 Bill Owens ' <br /> <br />hltp://walerstale.co. us/detauh. hlm Gavernur <br />Response to Reclama tion Permit A rr~~lication Con <br />~ sideration Creg E. bValcher <br />Y Y Exeurtrve Director <br /> Hal D. Simpson, P E. <br /> Slate Engineer <br />DATE: April S, 1999 <br />TO: Carl B. Mount, Senior Environmental Protection Specialist EGE1V~~l <br />CC: Division 6 Oftice; Bill Dunham, District 43 Water Commisaoner ~ R O $ X999 <br />FROM: Craig M. Lis ~~ y pP <br />RE: North River Gravel Pit Extznsion, File No. M-99-007 ~1V15to~otMln0~15&Vgt)ro9Y <br />Operator: Ace Wes[ Trucking, Inc. <br />Contact: Don Rooks <br />Section ~, Twp 1 North, Rng 102 West, 6th P.M., Rio Blanco County <br />CONDITIONS FOR APPROVAL <br />The proposed operation does not antloapate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation. ^ water removed in [hz mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, [he applicant will need to obtain either a t>,'avzl pit <br />or other type of well pern3it, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is regwred. <br />^ Prior to approving a will permit, [he applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of [he permit area. The applicant must then <br />obtain a waiver of objec[lon from all well owners with wells within 600 feet of the permit area or <br />reques[a hearing before the State Engineer. <br />^ Other: <br />COb7D7ENTS: In [he evznt [hat ground water is encountered or surface dtvzrsions are necessary, water is <br />currently available for appropnahon in this area, so an augmentation plan will not be necessary. <br />All water is to be trucked in from off-site sources. No ponds are to be constructed for reclamation. <br />