Laserfiche WebLink
HAYDEN GULCH TERMINAL, INC. <br />Hayden Gulch Loadout Facility <br />Permit No. G92-081 <br />Quarterly Sedimentation Pond Inspection Report <br />Dale of inspection: Cktober 5, 2000 Dale last Inspec[ed: September 20, 2000 <br />Pond: Rail Loop Pond (002A) Pond Lorntion: SE1/4SE1/4Sec.14T6NR88W <br />NPDES ID No.: OOG-850006-002A Site Loca[ion: 2 rtti. SE of Hayden, 00 <br />Facility Co^f'igura[ion: Embattkrnent Pond Owner's Rep: Nck Kasperik <br />Water Level (above or below principal spillway): Above Below _X_ >4 F[.. <br />Sedime^[ Level (below dewatering orifice [designated sediment IevelD: c _>4 _ Fc. <br />Sediment Removal Required: Yes No _X_ <br />Outflow: 0 cfs <br />FEATURE PROBLEM COMMEMS <br /> YES NO <br />EROSION <br />Rills & Gullies on Embankment X <br />Wave Erosion X <br />Spillway Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL <br />Differential Settling X <br />Cracla or Slides X <br />Seepage X <br />Other X <br />STRUCTURES <br />Principal Spillway X <br />Clogged Orifice X <br />dogged or Dartuged Cadvert X <br />Damaged Headgate X <br />Emerge^cy Spillway X <br />Erosion X <br />Riprap X <br />Clogged or Damaged Culvert X <br />Oster X <br />Maintenance Required: None <br />Maintenance Performed: No^e <br />Additional Comments: Pond basically dry. Several small puddles with less than 3-4 inches of water. No discharge observed <br />during quarter. No problems with pond during quarter. <br />NAME OF INSPECTOR Iohn G Weimnw <br />