Laserfiche WebLink
1111~~~~~~~~ 1~~11~~ <br />,~ CI ~`' ~Ja,,,y <br />I!~~ S~EXHIBIT L 5~1~1~1 <br />RECLAMATION COSTS <br />The total affected area involves 170.701 acres. When <br />reclamation is complete, there will be about 135.341 acres <br />of lake, 3.211 acres of road and 32.151 acres of revegetated <br />area. Of the five stages to be mined, Stages 4 and 5 are <br />the two consecutive stages with the largest area to be <br />revegetated. <br /> Acres t <br />Percent - Revege- Back- <br />Phase Disturbed Years Total Water Road tat ion fill <br />4 25 4-6 31.53 24.40 1.35 1.45* 0.00 <br />5 75 4-6 35.43 27.68 -0- 5.81** 4.35 <br />66.96 52.08 1.35 7.26 4.35 <br />The estimate of reclama~ion costs is based on the follow- <br />ing prices: <br />Grass seed mix, 11-1/2 lbs @ $1.70/lb. <br />Fertilizer (assumed; actual will depend <br />on soil analysis), nitrogen-phosphate <br />(18-46-0) @ $9.60/100 lbs. <br />Backfilling, 8 hrs/acre @ $45/hr. <br />Ripping compacted areas, 2 hrs/acre <br />@ $80/hr. <br />Grading and shaping, 4 hrs/acre @ $60/hr, <br />Resoiling and smoothing, 8 hrs/acre @ $45/hr <br />Seed drilling and fertilizing, 1.5 hrs/acre <br />@$45/hr. <br />Labor, 16 man hours @ $6.50/hr. <br />Trees, 500 bare-root @ $20/100 <br />Cost/Acre <br />$ 19.55 <br />9.60 <br />360.C0 <br />160.00 <br />240.00 <br />360.00 <br />67.50 <br />104.00 <br />100.00 <br />* Calculations are based on a time when reclamation is one- <br />** quarter from completion in Stage 4 and mining is three- <br />quarters complete in Stage 5 <br />-34- <br />